
With 30% of all system installations, power engineering is one of the main TRACE MODE® application industry. SCADA/HMI TRACE MODE® was used in hundreds of control systems employed both by power facilities (power companies, heat & power stations, district power plants, electricity and heat networks, etc) and industrial enterprises (boilers, in-house power systems).
Today, SCADA/HMI TRACE MODE® is in control of:
- dispatcher control systems at regional power companies;
- control systems of power units;
- control systems of boilers;
- dispatcher control systems in regional electricity and heat networks;
- power control and record systems;
- water processing systems;
- control systems of local heat stations and central heat facilities.
SCADA/HMI TRACE MODE is delivering effective solutions to a number regional electric companies, such as:
- Tatenergo (Russia);
- Tyumenenergo(Russia) ;
- Saratovenergo (Russia);
- Irkutskenergo (Russia);
- Vinnitsaenergo (Ukraine);
- Romen power station, Sumyoblenergo (Ukraine);
- Sevastopolenergo (Ukraine);
- Permgorkommunteplo (Russia);
- Altayenergo (Russia),
Power producers:
- Tyumen heat & power station (Russia);
- Surgut power plant (Russia);
- Gusinoozersk power plant (Russia);
- Krasnoyarsk hydropower station (Russia);
- Nassiriya heat & power station (Iraq);
- West Siberian heat & power station (Russia);
- Nizhnekamsk heat & power station 2 (Russia);
- Pskov district heat & power plant (Russia);
- Talimardzhan heat & power plant (Uzbekistan);
- Kazan heat & power station 1 (Russia);
and to many others.
The following large industrial enterprises automate their in-house power systems with SCADA/HMI TRACE MODE applications:
- Gazprom OAO;
- Severonikel metal plant;
- Appatit OAO;
- Kosogorsk Metallurgy Works;
- Irkutsk Aluminum Smelter;
and many others.
For more inplementations, please see our Reference List.
SCADA TRACE MODE at Nassiriya heat & power plant (Iraq)
TRACE MODE in power engineering: the bolier control system at Tobolsk heat & power station
TRACE MODE in GSM remote control system of central heating station in Perm' city
TRACE MODE for Commercial Metering of Energy, Gas and Heat in TATENERGO
Pskov district power plant deploys TRACE MODE for the process control system of the first (215 MW) power unit |